Construction variants for a Bydgoszcz bypass canal along the route of International Waterway E70

Authors

  • Karol Mieczkin Kazimierz Wielki University

Keywords:

Bydgoszcz Water Junction, Bydgoszcz Canal, Bypass Canal, International Waterway E70, Vistula–Oder waterway, inland water transport

Abstract

The paper presents different variants for a Bydgoszcz bypass canal prepared based on the analysis of historical materials as well as contemporary environmental and economic factors. While preparing the concept, the following aspects were taken into account: land relief, current land-use patterns, nature protection forms, and inland waterway development plans, including the location of a multimodal port in the vicinity of Solec Kujawski. As a result of the conducted analysis, four variants of the bypass canal were established: two of them running north of and two south of Bydgoszcz. In addition, their environmental and infrastructural impact was preliminary assessed as well as their functional and spatial connections with the surroundings were analysed. Furthermore, measures aimed at executing the designed projects were suggested. 

Downloads

Published

2017-11-09

How to Cite

Construction variants for a Bydgoszcz bypass canal along the route of International Waterway E70. (2017). Geography and Tourism, 2(5), 115-122. https://czasopisma.ukw.edu.pl/index.php/gat/article/view/82